Control-M Scheduling

Post your questions on ENDEVOR, COOLGEN, PANVALET and CA-7 tools

Moderator: Moderator Group

Post Reply
saurabhbhivandk
Member
Posts: 2
Joined: Thu Jan 05, 2012 12:47 pm

Control-M Scheduling

Post by saurabhbhivandk » Fri Jan 06, 2012 3:57 pm

If I run a job through Control-M and at the second step FTP a file to Windows – where there is another Scheduler kept, Do I need a file watch in this scheduler? Now that the File has arrived in Windows and I wish to run a program in Windows, and it finishes, will my control-m(in mainframes) automatically start the next dependency job or will I need a back handshake(Tag file being sent back to Mainframes from windows?)
Do I need a JCL to do all this or Schedulers perform this task all by itself?
S B

Post Reply

FREE TUTORIALS

Tutorials
Free tutorials from mainframegurukul
  • JCL Tutorial
    Covers all important JCL concepts.
  • Cobol Tutorial
    This tutorials covers all Cobol Topics from STRING to COMP-3.
  • DB2 Tutorial
    DB2 Tutorial focuses on DB2 COBOL Programming.
  • SORT Tutorial
    This Tutorial covers all important aspects of DFSORT with examples
  • CICS Tutorial
    This CICS tutorial covers CICS concepts and CICS Basics, CICS COBOL Programming.
Interview
Mainframe Interview questions



Other References
Mainframe Tools and others